NRG Greens Bayou 6 (TEF-Due Diligence) (24INR0410)

NRG Greens Bayou 6 (TEF-Due Diligence) is a 445.0 MW gas interconnection project in Harris, Texas with a current status of operational. It is proposed to connect at Position 1/0 PSSE 40710, Greens Bayou Substation, 138 kV.

445.0 MWCapacity
OperationalStatus
HarrisMarket
GasTechnology

Project facts

Canonical nameNRG Greens Bayou 6 (TEF-Due Diligence)
Queue ID24INR0410
Statusoperational
Source statusSS Completed, FIS Completed, IA
MarketHarris
TechnologyGas
Capacity445.0 MW
StateTexas
CountyHarris
Point of interconnectionPosition 1/0 PSSE 40710, Greens Bayou Substation, 138 kV
Requested (queue) date2022-08-16
Proposed in-service date
Operational date2028-05-01
Withdrawn date
DeveloperNRG Energy, Inc.
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata