NY-5632 Turnpike Rd (C24-077)

NY-5632 Turnpike Rd is a 19.9 MW solar interconnection project in Steuben, New York with a current status of withdrawn. It is proposed to connect at Bath - Howard 115 kV Line.

19.9 MWCapacity
WithdrawnStatus
NYISOMarket
SolarTechnology

Project facts

Canonical nameNY-5632 Turnpike Rd
Queue IDC24-077
Statuswithdrawn
Source statuswithdrawn
MarketNYISO
TechnologySolar
Capacity19.9 MW
StateNew York
CountySteuben
Point of interconnectionBath - Howard 115 kV Line
Requested (queue) date2024-08-06
Proposed in-service date
Operational date
Withdrawn date
DeveloperAbundant Solar Power INC.
Utility / transmission ownerNYSEG

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.