Oahe - Philip Tap 230 kV line (GEN-2024-059)

Oahe - Philip Tap 230 kV line is a 200.0 MW wind interconnection project in Stanley, South Dakota with a current status of withdrawn. It is proposed to connect at Oahe - Philip Tap 230 kV line.

200.0 MWCapacity
WithdrawnStatus
SDMarket
WindTechnology

Project facts

Canonical nameOahe - Philip Tap 230 kV line
Queue IDGEN-2024-059
Statuswithdrawn
Source statusWITHDRAWN
MarketSD
TechnologyWind
Capacity200.0 MW
StateSouth Dakota
CountyStanley
Point of interconnectionOahe - Philip Tap 230 kV line
Requested (queue) date2024-10-30
Proposed in-service date2028-12-29
Operational date
Withdrawn date2025-07-29
Developer
Utility / transmission ownerWAPA/BEPC/HCPD Integrated System

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata