Oak Grove 34.5 kV III (AD1-046)

Oak Grove 34.5 kV III is a 11.2 MW solar interconnection project in Westmoreland, Virginia with a current status of withdrawn.

11.2 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameOak Grove 34.5 kV III
Queue IDAD1-046
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity11.2 MW
StateVirginia
CountyWestmoreland
Point of interconnection
Requested (queue) date2017-07-31
Proposed in-service date2021-06-30
Operational date
Withdrawn date2020-08-14
Developer
Utility / transmission ownerDominion

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.