Oak Hall 138kV (W3-054A)

Oak Hall 138kV is a 95.0 MW wind interconnection project in Accomack, Virginia with a current status of withdrawn.

95.0 MWCapacity
WithdrawnStatus
—Market
WindTechnology

Project facts

Canonical nameOak Hall 138kV
Queue IDW3-054A
Statuswithdrawn
Source statusWithdrawn
Market—
TechnologyWind
Capacity95.0 MW
StateVirginia
CountyAccomack
Point of interconnection—
Requested (queue) date2010-08-31
Proposed in-service date2013-06-01
Operational date—
Withdrawn date2013-01-22
Developer—
Utility / transmission ownerODEC

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_project—withdrawnhigh

Explore related data

Source last checked2026-10-11
Data last materially changed2026-10-11
Page data generated2026-10-11

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata