Oberon II Solar Project (65735_OBIIB)

Oberon II Solar Project is a 125.0 MW battery interconnection project in Riverside, California with a current status of operational.

125.0 MWCapacity
OperationalStatus
CISOMarket
BatteryTechnology

Project facts

Canonical nameOberon II Solar Project
Queue ID65735_OBIIB
Statusoperational
Source status(OP) Operating
MarketCISO
TechnologyBattery
Capacity125.0 MW
StateCalifornia
CountyRiverside
Point of interconnection—
Requested (queue) date—
Proposed in-service date—
Operational date2023-09-01
Withdrawn date—
Developer—
Utility / transmission ownerIntersect USA, LLC

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_project—operationalhigh

Explore related data

Source last checked2026-10-02
Data last materially changed2026-10-02
Page data generated2026-10-12

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.