OCI SunRoper MW Increase to 24INR0167 is a 61.6 MW solar interconnection project in Wharton, Texas with a current status of withdrawn. It is proposed to connect at tap138kV #43190 South Lane City to #42985 Dyann CKT#60.
61.6 MWCapacity
WithdrawnStatus
ERCOTMarket
SolarTechnology
Project facts
| Canonical name | OCI SunRoper MW Increase to 24INR0167 |
|---|---|
| Queue ID | 25INR0291 |
| Status | withdrawn |
| Source status | withdrawn |
| Market | ERCOT |
| Technology | Solar |
| Capacity | 61.6 MW |
| State | Texas |
| County | Wharton |
| Point of interconnection | tap138kV #43190 South Lane City to #42985 Dyann CKT#60 |
| Requested (queue) date | — |
| Proposed in-service date | 2025-06-01 |
| Operational date | — |
| Withdrawn date | 2023-10-31 |
| Developer | OCI SunRoper LLC |
| Utility / transmission owner | ERCOT |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.