Odyssey Energy Altura Cogen, LLC (50815_GEN4)

Odyssey Energy Altura Cogen, LLC is a 84.9 MW gas interconnection project in Harris, Texas with a current status of operational.

84.9 MWCapacity
OperationalStatus
ERCOMarket
GasTechnology

Project facts

Canonical nameOdyssey Energy Altura Cogen, LLC
Queue ID50815_GEN4
Statusoperational
Source status(OP) Operating
MarketERCO
TechnologyGas
Capacity84.9 MW
StateTexas
CountyHarris
Point of interconnection—
Requested (queue) date—
Proposed in-service date—
Operational date1986-03-01
Withdrawn date—
Developer—
Utility / transmission ownerOdyssey Operating Services

What changed

ObservedFieldOld valueNew valueMateriality
2026-10-02capacity_mw77.284.9high
2026-09-02capacity_mw84.977.2high
2026-08-02new_project—operationalhigh

Explore related data

Source last checked2026-11-01
Data last materially changed2026-11-01
Page data generated2026-11-26

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata