Odyssey Energy Altura Cogen, LLC (50815_GEN6)

Odyssey Energy Altura Cogen, LLC is a 129.2 MW gas interconnection project in Harris, Texas with a current status of operational.

129.2 MWCapacity
OperationalStatus
ERCOMarket
GasTechnology

Project facts

Canonical nameOdyssey Energy Altura Cogen, LLC
Queue ID50815_GEN6
Statusoperational
Source status(OP) Operating
MarketERCO
TechnologyGas
Capacity129.2 MW
StateTexas
CountyHarris
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date1986-04-01
Withdrawn date
Developer
Utility / transmission ownerOdyssey Operating Services

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata