OFFERED Combined Cycle Gen (25INR0256)

OFFERED Combined Cycle Gen is a 520.0 MW gas interconnection project in Brazoria, Texas with a current status of withdrawn. It is proposed to connect at Tap 42215 Copper - 42199 BSTCM12_36_8 CKT36.

520.0 MWCapacity
WithdrawnStatus
ERCOTMarket
GasTechnology

Project facts

Canonical nameOFFERED Combined Cycle Gen
Queue ID25INR0256
Statuswithdrawn
Source statuswithdrawn
MarketERCOT
TechnologyGas
Capacity520.0 MW
StateTexas
CountyBrazoria
Point of interconnectionTap 42215 Copper - 42199 BSTCM12_36_8 CKT36
Requested (queue) date2022-12-14
Proposed in-service date2025-08-01
Operational date
Withdrawn date2023-09-06
DeveloperBlue Cube Operations
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-28

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata