OFW Solar Farm (AG2-086)

OFW Solar Farm is a 75.0 MW solar+battery interconnection project in Shenandoah, Virginia with a current status of active. It is proposed to connect at Mt. Jackson DP-Mt. Jackson 115 kV.

75.0 MWCapacity
ActiveStatus
PJMMarket
Solar+BatteryTechnology

Project facts

Canonical nameOFW Solar Farm
Queue IDAG2-086
Statusactive
Source statusactive
MarketPJM
TechnologySolar+Battery
Capacity75.0 MW
StateVirginia
CountyShenandoah
Point of interconnectionMt. Jackson DP-Mt. Jackson 115 kV
Requested (queue) date2025-02-19
Proposed in-service date2022-12-30
Operational date
Withdrawn date
DeveloperOFW Solar Farm, LLC
Utility / transmission ownerDominion

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata