Old 300 Storage (21INR0464)

Old 300 Storage is a 50.0 MW other interconnection project in Fort Bend, Texas with a current status of withdrawn. It is proposed to connect at tap 345kV 44200 Hillje - 44000 WA Parish.

50.0 MWCapacity
WithdrawnStatus
ERCOTMarket
OtherTechnology

Project facts

Canonical nameOld 300 Storage
Queue ID21INR0464
Statuswithdrawn
Source statuswithdrawn
MarketERCOT
TechnologyOther
Capacity50.0 MW
StateTexas
CountyFort Bend
Point of interconnectiontap 345kV 44200 Hillje - 44000 WA Parish
Requested (queue) date2019-11-17
Proposed in-service date2021-12-31
Operational date
Withdrawn date2020-03-20
DeveloperOld 300 Solar Center, LLC
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata