Old Middleboro Road Solar (64759_OLDBA)

Old Middleboro Road Solar is a 4.5 MW battery interconnection project in Plymouth, Massachusetts with a current status of operational.

4.5 MWCapacity
OperationalStatus
ISNEMarket
BatteryTechnology

Project facts

Canonical nameOld Middleboro Road Solar
Queue ID64759_OLDBA
Statusoperational
Source status(OP) Operating
MarketISNE
TechnologyBattery
Capacity4.5 MW
StateMassachusetts
CountyPlymouth
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date2023-01-01
Withdrawn date
Developer
Utility / transmission ownerAgilitas Energy, Inc.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.