OR Queue Project G0554 — Wind in Hood River, Oregon

OR Queue Project G0554 — Wind in Hood River, Oregon is a 148.0 MW wind interconnection project in Hood River, Oregon with a current status of withdrawn. It is proposed to connect at 1) BPA's Big Eddy-Troutdale 230 kV line, or 2) BPA's Big Eddy-McLoughlin 230 kV line.

148.0 MWCapacity
WithdrawnStatus
ORMarket
WindTechnology

Project facts

Canonical nameOR Queue Project G0554 — Wind in Hood River, Oregon
Queue IDG0554
Statuswithdrawn
Source statusWITHDRAWN
MarketOR
TechnologyWind
Capacity148.0 MW
StateOregon
CountyHood River
Point of interconnection1) BPA's Big Eddy-Troutdale 230 kV line, or 2) BPA's Big Eddy-McLoughlin 230 kV line
Requested (queue) date2016-10-07
Proposed in-service date2019-12-31
Operational date
Withdrawn date
Developer
Utility / transmission ownerBonneville Power Administration

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata