Orange Grove Solar (21INR0393)

Orange Grove Solar is a 130.6 MW solar+battery interconnection project in Jim Wells, Texas with a current status of operational. It is proposed to connect at 5660 Orange Grove 138kV.

130.6 MWCapacity
OperationalStatus
ERCOTMarket
Solar+BatteryTechnology

Project facts

Canonical nameOrange Grove Solar
Queue ID21INR0393
Statusoperational
Source statusoperational
MarketERCOT
TechnologySolar+Battery
Capacity130.6 MW
StateTexas
CountyJim Wells
Point of interconnection5660 Orange Grove 138kV
Requested (queue) date2019-07-11
Proposed in-service date2025-06-25
Operational date2025-04-21
Withdrawn date
DeveloperEnbridge Ingleside Solar, LLC
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.