Oscar Storage Project (22INR0493)

Oscar Storage Project is a 50.0 MW other interconnection project in Bell, Texas with a current status of withdrawn. It is proposed to connect at 3413 Knob Creek 345kV.

50.0 MWCapacity
WithdrawnStatus
ERCOTMarket
OtherTechnology

Project facts

Canonical nameOscar Storage Project
Queue ID22INR0493
Statuswithdrawn
Source statuswithdrawn
MarketERCOT
TechnologyOther
Capacity50.0 MW
StateTexas
CountyBell
Point of interconnection3413 Knob Creek 345kV
Requested (queue) date2021-02-28
Proposed in-service date2024-06-01
Operational date
Withdrawn date2024-02-05
DeveloperWoodlands Energy Renewables LLC
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata