Outrider BESS (28INR0288)
Outrider BESS is a 302.0 MW other interconnection project in Dickens, Texas with a current status of operational. It is proposed to connect at Tap 345 kV 59904 Cottonwood (W_CW_345) - 60500 Edith Clarke (EDITHCLA7A) CKT. Approximately distance from the POI to Cottonwood Substation is 11.13 miles and to Edith Clarke Substation 77.6 miles. .
Project facts
| Canonical name | Outrider BESS |
|---|---|
| Queue ID | 28INR0288 |
| Status | operational |
| Source status | SS Completed, FIS Started, IA |
| Market | Dickens |
| Technology | Other |
| Capacity | 302.0 MW |
| State | Texas |
| County | Dickens |
| Point of interconnection | Tap 345 kV 59904 Cottonwood (W_CW_345) - 60500 Edith Clarke (EDITHCLA7A) CKT. Approximately distance from the POI to Cottonwood Substation is 11.13 miles and to Edith Clarke Substation 77.6 miles. |
| Requested (queue) date | 2025-06-05 |
| Proposed in-service date | — |
| Operational date | 2029-06-26 |
| Withdrawn date | — |
| Developer | Sanders Hollow Energy Center, LLC |
| Utility / transmission owner | ERCOT |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-07-31 | new_project | — | operational | high |
Explore related data
Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata