Owens Solar (24INR0213)

Owens Solar is a 203.5 MW solar interconnection project in Bosque, Texas with a current status of suspended. It is proposed to connect at Tap 138kV line between 177 BOSQUE and 181 Cayote.

203.5 MWCapacity
SuspendedStatus
ERCOTMarket
SolarTechnology

Project facts

Canonical nameOwens Solar
Queue ID24INR0213
Statussuspended
Source statussuspended
MarketERCOT
TechnologySolar
Capacity203.5 MW
StateTexas
CountyBosque
Point of interconnectionTap 138kV line between 177 BOSQUE and 181 Cayote
Requested (queue) date2022-02-06
Proposed in-service date2025-12-31
Operational date
Withdrawn date2025-10-16
DeveloperOwens Electric & Solar
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.