Owl Trap Switching Station 115kV (AH1-355 - moved to TC2)

Owl Trap Switching Station 115kV is a 40.0 MW battery interconnection project in Gloucester, Virginia with a current status of withdrawn.

40.0 MWCapacity
WithdrawnStatus
—Market
BatteryTechnology

Project facts

Canonical nameOwl Trap Switching Station 115kV
Queue IDAH1-355 - moved to TC2
Statuswithdrawn
Source statusWithdrawn
Market—
TechnologyBattery
Capacity40.0 MW
StateVirginia
CountyGloucester
Point of interconnection—
Requested (queue) date2021-09-10
Proposed in-service date2024-09-10
Operational date—
Withdrawn date2025-03-25
Developer—
Utility / transmission ownerDominion

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_project—withdrawnhigh

Explore related data

Source last checked2026-11-26
Data last materially changed2026-11-26
Page data generated2026-11-26

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata