PACE Queue Project C1-14 — Solar+Battery in Emery, Utah

PACE Queue Project C1-14 — Solar+Battery in Emery, Utah is a 120.0 MW solar+battery interconnection project in Emery, Utah with a current status of suspended. It is proposed to connect at Emery-Sigurd #2 transmission line.

120.0 MWCapacity
SuspendedStatus
PACEMarket
Solar+BatteryTechnology

Project facts

Canonical namePACE Queue Project C1-14 — Solar+Battery in Emery, Utah
Queue IDC1-14
Statussuspended
Source statusSuspended
MarketPACE
TechnologySolar+Battery
Capacity120.0 MW
StateUtah
CountyEmery
Point of interconnectionEmery-Sigurd #2 transmission line
Requested (queue) date2021-04-21
Proposed in-service date2029-02-27
Operational date
Withdrawn date
Developer
Utility / transmission ownerPacifiCorp

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_projectsuspendedhigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27

Provenance: pacificorp-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.