PACE Queue Project C2-167 — Solar in Emery, Utah

PACE Queue Project C2-167 — Solar in Emery, Utah is a 125.0 MW solar interconnection project in Emery, Utah with a current status of suspended. It is proposed to connect at Huntington-Pinto transmission line.

125.0 MWCapacity
SuspendedStatus
PACEMarket
SolarTechnology

Project facts

Canonical namePACE Queue Project C2-167 — Solar in Emery, Utah
Queue IDC2-167
Statussuspended
Source statusSuspended
MarketPACE
TechnologySolar
Capacity125.0 MW
StateUtah
CountyEmery
Point of interconnectionHuntington-Pinto transmission line
Requested (queue) date2022-05-15
Proposed in-service date2026-05-01
Operational date—
Withdrawn date—
Developer—
Utility / transmission ownerPacifiCorp

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-10-26statusactivesuspendedhigh
2026-08-03new_project—activehigh

Explore related data

Source last checked2026-11-23
Data last materially changed2026-11-23
Page data generated2026-11-26

Provenance: pacificorp-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.