PACE Queue Project C2-99 — Solar+Battery in Emery, Utah

PACE Queue Project C2-99 — Solar+Battery in Emery, Utah is a 166.0 MW solar+battery interconnection project in Emery, Utah with a current status of active. It is proposed to connect at Emery substation.

166.0 MWCapacity
ActiveStatus
PACEMarket
Solar+BatteryTechnology

Project facts

Canonical namePACE Queue Project C2-99 — Solar+Battery in Emery, Utah
Queue IDC2-99
Statusactive
Source statusIn Progress
MarketPACE
TechnologySolar+Battery
Capacity166.0 MW
StateUtah
CountyEmery
Point of interconnectionEmery substation
Requested (queue) date2022-05-13
Proposed in-service date2026-12-31
Operational date—
Withdrawn date—
Developer—
Utility / transmission ownerPacifiCorp

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_project—activehigh

Explore related data

Source last checked2026-11-23
Data last materially changed2026-11-23
Page data generated2026-11-26

Provenance: pacificorp-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata