PACE Queue Project C3-005 — Battery in Emery, Utah
PACE Queue Project C3-005 — Battery in Emery, Utah is a 199.9 MW battery interconnection project in Emery, Utah with a current status of withdrawn. It is proposed to connect at Huntington substation.
199.9 MWCapacity
WithdrawnStatus
PACEMarket
BatteryTechnology
Project facts
| Canonical name | PACE Queue Project C3-005 — Battery in Emery, Utah |
|---|---|
| Queue ID | C3-005 |
| Status | withdrawn |
| Source status | Withdrawn |
| Market | PACE |
| Technology | Battery |
| Capacity | 199.9 MW |
| State | Utah |
| County | Emery |
| Point of interconnection | Huntington substation |
| Requested (queue) date | 2023-04-03 |
| Proposed in-service date | 2028-05-31 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | PacifiCorp |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-03 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27
Provenance: pacificorp-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata