PACE Queue Project S0016 — Battery in Sevier, Utah

PACE Queue Project S0016 — Battery in Sevier, Utah is a 80.0 MW battery interconnection project in Sevier, Utah with a current status of active. It is proposed to connect at Sigurd substation.

80.0 MWCapacity
ActiveStatus
PACEMarket
BatteryTechnology

Project facts

Canonical namePACE Queue Project S0016 — Battery in Sevier, Utah
Queue IDS0016
Statusactive
Source statusIn Progress
MarketPACE
TechnologyBattery
Capacity80.0 MW
StateUtah
CountySevier
Point of interconnectionSigurd substation
Requested (queue) date2022-11-18
Proposed in-service date2028-02-28
Operational date
Withdrawn date
Developer
Utility / transmission ownerPacifiCorp

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-17proposed_online_date2027-06-302028-02-28medium
2026-08-03new_projectactivehigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27

Provenance: pacificorp-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata