PACW Queue Project C1-41 — Solar+Battery in Modoc, California

PACW Queue Project C1-41 — Solar+Battery in Modoc, California is a 60.0 MW solar+battery interconnection project in Modoc, California with a current status of withdrawn. It is proposed to connect at Clearlake Substation.

60.0 MWCapacity
WithdrawnStatus
PACWMarket
Solar+BatteryTechnology

Project facts

Canonical namePACW Queue Project C1-41 — Solar+Battery in Modoc, California
Queue IDC1-41
Statuswithdrawn
Source statusWithdrawn
MarketPACW
TechnologySolar+Battery
Capacity60.0 MW
StateCalifornia
CountyModoc
Point of interconnectionClearlake Substation
Requested (queue) date2021-05-14
Proposed in-service date2023-12-31
Operational date
Withdrawn date
Developer
Utility / transmission ownerPacifiCorp

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-28

Provenance: pacificorp-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata