Padua Grid BESS Unit 2 (24INR0533)

Padua Grid BESS Unit 2 is a 150.9 MW battery interconnection project in Bexar, Texas with a current status of active. It is proposed to connect at 5395 Sommers 138kV.

150.9 MWCapacity
ActiveStatus
ERCOTMarket
BatteryTechnology

Project facts

Canonical namePadua Grid BESS Unit 2
Queue ID24INR0533
Statusactive
Source statusactive
MarketERCOT
TechnologyBattery
Capacity150.9 MW
StateTexas
CountyBexar
Point of interconnection5395 Sommers 138kV
Requested (queue) date2023-06-07
Proposed in-service date2026-03-16
Operational date
Withdrawn date
DeveloperPadua Grid 3, LLC
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata