Paint Rock Wind (27INR0108)

Paint Rock Wind is a 379.2 MW other interconnection project in Concho, Texas with a current status of operational. It is proposed to connect at Amos Creek (7077) – Bow Wood (76006).

379.2 MWCapacity
OperationalStatus
ConchoMarket
OtherTechnology

Project facts

Canonical namePaint Rock Wind
Queue ID27INR0108
Statusoperational
Source statusSS Completed, FIS Started, No IA
MarketConcho
TechnologyOther
Capacity379.2 MW
StateTexas
CountyConcho
Point of interconnectionAmos Creek (7077) – Bow Wood (76006)
Requested (queue) date2024-01-03
Proposed in-service date
Operational date2028-10-01
Withdrawn date
DeveloperOrsted Onshore Development North America, LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata