Palmas Wind, LLC (61773_PW)

Palmas Wind, LLC is a 144.9 MW wind interconnection project in Cameron, Texas with a current status of operational.

144.9 MWCapacity
OperationalStatus
ERCOMarket
WindTechnology

Project facts

Canonical namePalmas Wind, LLC
Queue ID61773_PW
Statusoperational
Source status(OP) Operating
MarketERCO
TechnologyWind
Capacity144.9 MW
StateTexas
CountyCameron
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date2020-11-01
Withdrawn date
Developer
Utility / transmission ownerAcciona Energy USA Global, LLC

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata