Palmer Springs 115 kV (AG1-446 - moved to TC1)

Palmer Springs 115 kV is a 26.0 MW battery interconnection project in Mecklenburg, Virginia with a current status of withdrawn.

26.0 MWCapacity
WithdrawnStatus
Market
BatteryTechnology

Project facts

Canonical namePalmer Springs 115 kV
Queue IDAG1-446 - moved to TC1
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyBattery
Capacity26.0 MW
StateVirginia
CountyMecklenburg
Point of interconnection
Requested (queue) date2020-09-30
Proposed in-service date2023-12-31
Operational date
Withdrawn date2024-06-24
Developer
Utility / transmission ownerDominion

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata