Palmview BESS (24INR0628)
Palmview BESS is a 9.9 MW battery interconnection project in Hidalgo, Texas with a current status of active. It is proposed to connect at Palmview XFMR 2 CKT 6790 Substation transmission - 138kv ERCOT station code - PALMVIEW PTI Bus # 8387 ERCOT Load Name - LD02.
Project facts
| Canonical name | Palmview BESS |
|---|---|
| Queue ID | 24INR0628 |
| Status | active |
| Source status | active |
| Market | ERCOT |
| Technology | Battery |
| Capacity | 9.9 MW |
| State | Texas |
| County | Hidalgo |
| Point of interconnection | Palmview XFMR 2 CKT 6790 Substation transmission - 138kv ERCOT station code - PALMVIEW PTI Bus # 8387 ERCOT Load Name - LD02 |
| Requested (queue) date | — |
| Proposed in-service date | 2026-04-20 |
| Operational date | — |
| Withdrawn date | — |
| Developer | SBESS TX10 LLC |
| Utility / transmission owner | ERCOT |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata