Palo Duro Energy Storage (70199_PALO1)

Palo Duro Energy Storage is a 150.0 MW battery interconnection project in Ochiltree, Texas with a current status of active.

150.0 MWCapacity
ActiveStatus
SWPPMarket
BatteryTechnology

Project facts

Canonical namePalo Duro Energy Storage
Queue ID70199_PALO1
Statusactive
Source status(P) Planned for installation, but regulatory approvals not initiated
MarketSWPP
TechnologyBattery
Capacity150.0 MW
StateTexas
CountyOchiltree
Point of interconnection—
Requested (queue) date—
Proposed in-service date2027-11-01
Operational date—
Withdrawn date—
Developer—
Utility / transmission ownerPalo Duro Energy Storage, LLC

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_project—activehigh

Explore related data

Source last checked2026-11-01
Data last materially changed2026-11-01
Page data generated2026-11-26

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata