Panhandle Flagship Solar 3 (27INR0024)

Panhandle Flagship Solar 3 is a 260.3 MW solar interconnection project in Hutchinson, Texas with a current status of operational. It is proposed to connect at 345 kV Railhead Substation (RAILHEAD #79005).Station 3 (27INR0024) connects to Station 2 (27INR0023) via a 4.4 mile internal tie line. Station 2 connects to Station 1 (27INR0022 & 27INR0025) via a 4.9 mile internal tie line. Station 1 connects to POI.

260.3 MWCapacity
OperationalStatus
HutchinsonMarket
SolarTechnology

Project facts

Canonical namePanhandle Flagship Solar 3
Queue ID27INR0024
Statusoperational
Source statusSS Completed, FIS Started, IA
MarketHutchinson
TechnologySolar
Capacity260.3 MW
StateTexas
CountyHutchinson
Point of interconnection345 kV Railhead Substation (RAILHEAD #79005).Station 3 (27INR0024) connects to Station 2 (27INR0023) via a 4.4 mile internal tie line. Station 2 connects to Station 1 (27INR0022 & 27INR0025) via a 4.9 mile internal tie line. Station 1 connects to POI
Requested (queue) date2023-03-13
Proposed in-service date
Operational date2031-06-30
Withdrawn date
DeveloperPanhandle Solar Group Operating Company LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-28

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata