Hutchinson County, Texas — Interconnection Projects

The interXdata warehouse tracks 8 interconnection projects in Hutchinson, Texas, representing 1,229 MW of requested capacity.

8Total projects
0Active
7Operational
1Withdrawn
1,229 MWRequested capacity

Technology mix

TechnologyProjectsRequested capacity
Solar3915 MW
Gas4294 MW
Wind120 MW

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
Pringle 115kV SubstationGEN-2022-063Solar350.0 MWwithdrawnHutchinson, Texas
Panhandle Flagship Solar 227INR0023Solar304.4 MWoperationalHutchinson, Texas
Panhandle Flagship Solar 327INR0024Solar260.3 MWoperationalHutchinson, Texas
Black Hawk Station55064_UNT1Gas126.9 MWoperationalHutchinson, Texas
Black Hawk Station55064_UNT2BGas117.0 MWoperationalHutchinson, Texas
Borger Plant50067_GEN1Gas30.0 MWoperationalHutchinson, Texas
Engineered Carbons Borger Cogen10072_GEN1Gas20.0 MWoperationalHutchinson, Texas
ASGI-2011-002ASGI-2011-002Wind20.0 MWoperationalHutchinson, Texas

Top developers

Developer (canonical)ProjectsCapacity
Panhandle Solar Group Operating Company LLC2565 MW

Explore related data

Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); ERCOT — Generation Interconnection Status (GIS) report; Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Get an alert when a new project is proposed in Hutchinson County.