Pawnee Lake 115 kV Substation (GEN-2024-173)

Pawnee Lake 115 kV Substation is a 200.0 MW battery interconnection project in Lancaster, Nebraska with a current status of withdrawn. It is proposed to connect at Pawnee Lake 115 kV Substation.

200.0 MWCapacity
WithdrawnStatus
NEMarket
BatteryTechnology

Project facts

Canonical namePawnee Lake 115 kV Substation
Queue IDGEN-2024-173
Statuswithdrawn
Source statusWITHDRAWN
MarketNE
TechnologyBattery
Capacity200.0 MW
StateNebraska
CountyLancaster
Point of interconnectionPawnee Lake 115 kV Substation
Requested (queue) date2025-03-01
Proposed in-service date2028-05-17
Operational date
Withdrawn date2026-08-10
Developer
Utility / transmission ownerNPPD

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-12operational_date2028-02-17medium
2026-08-12proposed_online_date2028-05-17medium
2026-08-12withdrawn_date2026-08-10high
2026-08-12statusoperationalwithdrawnhigh
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata