Pearl Moon (25INR0511)

Pearl Moon is a 208.0 MW solar interconnection project in Colorado, Texas with a current status of active. It is proposed to connect at Tap 345kV 9073 Holman - 44200 Hillje.

208.0 MWCapacity
ActiveStatus
ERCOTMarket
SolarTechnology

Project facts

Canonical namePearl Moon
Queue ID25INR0511
Statusactive
Source statusactive
MarketERCOT
TechnologySolar
Capacity208.0 MW
StateTexas
CountyColorado
Point of interconnectionTap 345kV 9073 Holman - 44200 Hillje
Requested (queue) date2023-09-07
Proposed in-service date2029-04-26
Operational date
Withdrawn date
DeveloperPearl Moon Solar, LLC
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata