Pecan Row Landfill To Electric Facility is a 1.6 MW gas interconnection project in Lowndes, Georgia with a current status of operational.

1.6 MWCapacity
OperationalStatus
SOCOMarket
GasTechnology

Project facts

Canonical namePecan Row Landfill To Electric Facility
Queue ID59221_GEN3
Statusoperational
Source status(OP) Operating
MarketSOCO
TechnologyGas
Capacity1.6 MW
StateGeorgia
CountyLowndes
Point of interconnection—
Requested (queue) date—
Proposed in-service date—
Operational date2013-12-01
Withdrawn date—
Developer—
Utility / transmission ownerEnergy Developments, Inc d/b/a EDL

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_project—operationalhigh

Explore related data

Source last checked2026-10-02
Data last materially changed2026-10-02
Page data generated2026-10-11

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.