Lowndes County, Georgia — Interconnection Projects

The interXdata warehouse tracks 21 interconnection projects in Lowndes, Georgia, representing 196 MW of requested capacity.

21Total projects
1Active
20Operational
0Withdrawn
196 MWRequested capacity

Technology mix

TechnologyProjectsRequested capacity
Other979 MW
Solar658 MW
Battery150 MW
Gas46 MW
Solar+Battery14 MW

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
PCA-Valdosta Mill60084_TG3Other52.3 MWoperationalLowndes, Georgia
Moody Air Force Base Solar62377_2Battery49.5 MWoperationalLowndes, Georgia
Moody Air Force Base Solar62377_1Solar49.5 MWoperationalLowndes, Georgia
PCA-Valdosta Mill60084_TG1Other10.1 MWoperationalLowndes, Georgia
PCA-Valdosta Mill60084_TG2Other7.5 MWoperationalLowndes, Georgia
Southeast Queue Project IC-1199 — Solar+Battery in Lowndes, GeorgiaIC-1199Solar+Battery3.5 MWactiveLowndes, Georgia
Lowndes Cowart67240_LCPV1Solar3.0 MWoperationalLowndes, Georgia
Lowndes Tycor Farms64279_LTFSolar2.3 MWoperationalLowndes, Georgia
South Georgia Medical Center Inc54848_GEN2AOther2.0 MWoperationalLowndes, Georgia
South Georgia Medical Center Inc54848_GEN1AOther2.0 MWoperationalLowndes, Georgia
Valdosta Water Treatment Plant54839_GEN1Other1.7 MWoperationalLowndes, Georgia
Valdosta Water Treatment Plant54839_GEN2Other1.7 MWoperationalLowndes, Georgia
Pecan Row Landfill To Electric Facility59221_GEN1Gas1.6 MWoperationalLowndes, Georgia
Pecan Row Landfill To Electric Facility59221_GEN3Gas1.6 MWoperationalLowndes, Georgia
Pecan Row Landfill To Electric Facility59221_GEN2Gas1.6 MWoperationalLowndes, Georgia
Pecan Row Landfill To Electric Facility59221_GM04Gas1.6 MWoperationalLowndes, Georgia
Lowndes IDA64278_LIDASolar1.5 MWoperationalLowndes, Georgia
Valdosta (Terraform)60448_VALDSolar1.0 MWoperationalLowndes, Georgia
Valdosta Prison61468_GPVP1Solar1.0 MWoperationalLowndes, Georgia
South Georgia Medical Center Inc54848_GEN 7Other0.8 MWoperationalLowndes, Georgia
South Georgia Medical Center Inc54848_GEN4Other0.7 MWoperationalLowndes, Georgia

Top developers

Developer attribution is not yet resolved for this set.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Get an alert when a new project is proposed in Lowndes County.

Start tracking with interXdata