Peninsula-Whealton 115 kV (AG2-010 - moved to TC2)

Peninsula-Whealton 115 kV is a 100.0 MW battery interconnection project in City Of Hampton, Virginia with a current status of withdrawn.

100.0 MWCapacity
WithdrawnStatus
Market
BatteryTechnology

Project facts

Canonical namePeninsula-Whealton 115 kV
Queue IDAG2-010 - moved to TC2
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyBattery
Capacity100.0 MW
StateVirginia
CountyCity Of Hampton
Point of interconnection
Requested (queue) date2020-10-09
Proposed in-service date2027-12-01
Operational date
Withdrawn date2025-11-19
Developer
Utility / transmission ownerDominion

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-28

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.