PEREGRINE BESS (23INR0206)

PEREGRINE BESS is a 150.0 MW battery interconnection project in Goliad, Texas with a current status of withdrawn.

150.0 MWCapacity
WithdrawnStatus
GoliadMarket
BatteryTechnology

Project facts

Canonical namePEREGRINE BESS
Queue ID23INR0206
Statuswithdrawn
Source status—
MarketGoliad
TechnologyBattery
Capacity150.0 MW
StateTexas
CountyGoliad
Point of interconnection—
Requested (queue) date—
Proposed in-service date—
Operational date—
Withdrawn date2026-09-14
Developer—
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-10-30developerCED Development Inc.—low
2026-10-30poi_nametap 345kV 8624 Grissom - 8164 Coleto Creek —low
2026-10-30phaseSS Completed, FIS Started, No IA—low
2026-10-30operational_date2027-07-01—medium
2026-10-30withdrawn_date—2026-09-14high
2026-10-30statusoperationalwithdrawnhigh
2026-07-31new_project—operationalhigh

Explore related data

Source last checked2026-10-30
Data last materially changed2026-10-30
Page data generated2026-11-26

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.