Perth 115kV (AC2-107)

Perth 115kV is a 100.0 MW solar interconnection project in Halifax, Virginia with a current status of withdrawn.

100.0 MWCapacity
WithdrawnStatus
—Market
SolarTechnology

Project facts

Canonical namePerth 115kV
Queue IDAC2-107
Statuswithdrawn
Source statusWithdrawn
Market—
TechnologySolar
Capacity100.0 MW
StateVirginia
CountyHalifax
Point of interconnection—
Requested (queue) date2017-03-13
Proposed in-service date2019-10-01
Operational date—
Withdrawn date2019-03-27
Developer—
Utility / transmission ownerDominion

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_project—withdrawnhigh

Explore related data

Source last checked2026-10-11
Data last materially changed2026-10-11
Page data generated2026-10-11

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata