PG&E DG PGE-INT-107035703 (PGE-INT-107035703)

PG&E DG PGE-INT-107035703 is a 14.5 MW solar interconnection project in Yolo, California with a current status of operational.

14.5 MWCapacity
OperationalStatus
DAVISMarket
SolarTechnology

Project facts

Canonical namePG&E DG PGE-INT-107035703
Queue IDPGE-INT-107035703
Statusoperational
Source statusInterconnected
MarketDAVIS
TechnologySolar
Capacity14.5 MW
StateCalifornia
CountyYolo
Point of interconnection
Requested (queue) date2013-07-19
Proposed in-service date
Operational date2015-08-26
Withdrawn date
Developer
Utility / transmission ownerPG&E

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectoperationalhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: ca-dgstats. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata