PG&E DG PGE-INT-112583515 (PGE-INT-112583515)
PG&E DG PGE-INT-112583515 is a 2.1 MW solar interconnection project in Fresno, California with a current status of operational.
2.1 MWCapacity
OperationalStatus
FRESNOMarket
SolarTechnology
Project facts
| Canonical name | PG&E DG PGE-INT-112583515 |
|---|---|
| Queue ID | PGE-INT-112583515 |
| Status | operational |
| Source status | Interconnected |
| Market | FRESNO |
| Technology | Solar |
| Capacity | 2.1 MW |
| State | California |
| County | Fresno |
| Point of interconnection | — |
| Requested (queue) date | 2017-01-31 |
| Proposed in-service date | — |
| Operational date | 2018-09-14 |
| Withdrawn date | — |
| Developer | SunEdison |
| Utility / transmission owner | PG&E |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | operational | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27
Provenance: ca-dgstats. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.