Pierce Brook-Lewis Run 230kV (A01-357)
Pierce Brook-Lewis Run 230kV is a 20.0 MW solar interconnection project in Mckean, Pennsylvania with a current status of withdrawn. It is proposed to connect at Pierce Brook-Lewis Run 230kV.
20.0 MWCapacity
WithdrawnStatus
NYISOMarket
SolarTechnology
Project facts
| Canonical name | Pierce Brook-Lewis Run 230kV |
|---|---|
| Queue ID | A01-357 |
| Status | withdrawn |
| Source status | withdrawn |
| Market | NYISO |
| Technology | Solar |
| Capacity | 20.0 MW |
| State | Pennsylvania |
| County | Mckean |
| Point of interconnection | Pierce Brook-Lewis Run 230kV |
| Requested (queue) date | 2025-09-26 |
| Proposed in-service date | — |
| Operational date | — |
| Withdrawn date | — |
| Developer | McKean County Solar, LLC |
| Utility / transmission owner | PJM |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-28
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata