Pin Peaking Energy Center 2 (TEF- Due Diligence) (26INR0109)

Pin Peaking Energy Center 2 (TEF- Due Diligence) is a 228.0 MW gas interconnection project in Freestone, Texas with a current status of active. It is proposed to connect at 3134 RICHLAND CHAMBERS (PSS/E Bus Name: RICHLND1_5).

228.0 MWCapacity
ActiveStatus
ERCOTMarket
GasTechnology

Project facts

Canonical namePin Peaking Energy Center 2 (TEF- Due Diligence)
Queue ID26INR0109
Statusactive
Source statusactive
MarketERCOT
TechnologyGas
Capacity228.0 MW
StateTexas
CountyFreestone
Point of interconnection3134 RICHLAND CHAMBERS (PSS/E Bus Name: RICHLND1_5)
Requested (queue) date2023-04-19
Proposed in-service date2026-05-01
Operational date
Withdrawn date
DeveloperPIN OAK CREEK ENERGY CENTER, LLC
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata