Pintail BESS (68582_PPB)

Pintail BESS is a 200.0 MW battery interconnection project in San Patricio, Texas with a current status of operational.

200.0 MWCapacity
OperationalStatus
ERCOMarket
BatteryTechnology

Project facts

Canonical namePintail BESS
Queue ID68582_PPB
Statusoperational
Source status(OP) Operating
MarketERCO
TechnologyBattery
Capacity200.0 MW
StateTexas
CountySan Patricio
Point of interconnection—
Requested (queue) date—
Proposed in-service date—
Operational date2026-09-01
Withdrawn date—
Developer—
Utility / transmission ownerLydian Energy

What changed

ObservedFieldOld valueNew valueMateriality
2026-11-01operational_date—2026-09-01medium
2026-11-01proposed_online_date2026-09-01—medium
2026-11-01statusactiveoperationalhigh
2026-10-02proposed_online_date2026-07-012026-09-01medium
2026-08-02new_project—activehigh

Explore related data

Source last checked2026-11-01
Data last materially changed2026-11-01
Page data generated2026-11-26

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata