Pioneer DJ Wind (23INR0387)

Pioneer DJ Wind is a 140.3 MW wind interconnection project in Midland, Texas with a current status of operational. It is proposed to connect at 138 kV Driver station (Bus #: 23863).

140.3 MWCapacity
OperationalStatus
ERCOTMarket
WindTechnology

Project facts

Canonical namePioneer DJ Wind
Queue ID23INR0387
Statusoperational
Source statusoperational
MarketERCOT
TechnologyWind
Capacity140.3 MW
StateTexas
CountyMidland
Point of interconnection138 kV Driver station (Bus #: 23863)
Requested (queue) date2021-10-10
Proposed in-service date2025-02-28
Operational date2025-02-28
Withdrawn date
DeveloperPioneer Green Energy, LLC
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata