Pioneer Path Energy Storage 1 (27INR0418)

Pioneer Path Energy Storage 1 is a 102.1 MW other interconnection project in Robertson, Texas with a current status of operational. It is proposed to connect at Tap 345kV 39950 TNP ONE PLANT - 3400 TWIN OAK Ckt 2.

102.1 MWCapacity
OperationalStatus
RobertsonMarket
OtherTechnology

Project facts

Canonical namePioneer Path Energy Storage 1
Queue ID27INR0418
Statusoperational
Source statusSS Completed, FIS Started, No IA
MarketRobertson
TechnologyOther
Capacity102.1 MW
StateTexas
CountyRobertson
Point of interconnectionTap 345kV 39950 TNP ONE PLANT - 3400 TWIN OAK Ckt 2
Requested (queue) date2025-02-03
Proposed in-service date
Operational date2027-12-01
Withdrawn date
DeveloperTempus Power management LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata