Pioneer Path Energy Storage 4 (27INR0425)
Pioneer Path Energy Storage 4 is a 102.1 MW other interconnection project in Robertson, Texas with a current status of operational. It is proposed to connect at Tap 345kV 39950 TNP ONE PLANT - 3400 TWIN OAK Ckt 2.
102.1 MWCapacity
OperationalStatus
RobertsonMarket
OtherTechnology
Project facts
| Canonical name | Pioneer Path Energy Storage 4 |
|---|---|
| Queue ID | 27INR0425 |
| Status | operational |
| Source status | SS Completed, FIS Started, No IA |
| Market | Robertson |
| Technology | Other |
| Capacity | 102.1 MW |
| State | Texas |
| County | Robertson |
| Point of interconnection | Tap 345kV 39950 TNP ONE PLANT - 3400 TWIN OAK Ckt 2 |
| Requested (queue) date | 2025-02-03 |
| Proposed in-service date | — |
| Operational date | 2027-12-01 |
| Withdrawn date | — |
| Developer | Tempus Power management LLC |
| Utility / transmission owner | ERCOT |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-07-31 | new_project | — | operational | high |
Explore related data
Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27
Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.