Pitts Dudik Solar (20INR0074)

Pitts Dudik Solar is a 49.6 MW solar interconnection project in Hill, Texas with a current status of operational. It is proposed to connect at 138 kV Ash Creek Switch (#3473).

49.6 MWCapacity
OperationalStatus
ERCOTMarket
SolarTechnology

Project facts

Canonical namePitts Dudik Solar
Queue ID20INR0074
Statusoperational
Source statusoperational
MarketERCOT
TechnologySolar
Capacity49.6 MW
StateTexas
CountyHill
Point of interconnection138 kV Ash Creek Switch (#3473)
Requested (queue) date2018-04-11
Proposed in-service date2023-11-02
Operational date2023-11-03
Withdrawn date
DeveloperElawan Pitts Dudik Solar, LLC
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata