PJM Queue Project AE2-250 — Solar in Greensville, Virginia

PJM Queue Project AE2-250 — Solar in Greensville, Virginia is a 82.5 MW solar interconnection project in Greensville, Virginia with a current status of withdrawn. It is proposed to connect at Purdy Sw.-Reams 115 kV.

82.5 MWCapacity
WithdrawnStatus
PJMMarket
SolarTechnology

Project facts

Canonical namePJM Queue Project AE2-250 — Solar in Greensville, Virginia
Queue IDAE2-250
Statuswithdrawn
Source statuswithdrawn
MarketPJM
TechnologySolar
Capacity82.5 MW
StateVirginia
CountyGreensville
Point of interconnectionPurdy Sw.-Reams 115 kV
Requested (queue) date2019-03-26
Proposed in-service date2021-09-30
Operational date
Withdrawn date2025-01-22
DeveloperWyatt Mill Solar, LLC
Utility / transmission ownerDominion

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata